Fish and Game Department's Motion for Approval of Invoice - January 18, 2011
NH Supreme Court Decision on the IWAG Appeal - April 15, 2010
Notice of the Appeal of Industrial Wind Action Group - December 14, 2009
Affidavits of Publication - September 29, 2009
Motions for Rehearing - September 29, 2009
Affidavits of Publication - September 24, 2009
Letter from the Coos County Commissioners - September 23, 2009
Procedural Order and Notice of Public Meeting - September 11, 2009
Response of Counsel for the Public to Applicant's Motion for Rehearing - August 25, 2009
IWAG Response to GRP Response to F&G Motion for Rehearing or Amendment - August 24, 2009
IWAG Objection for Rehearing of GRP LLC - August 24, 2009
Fish and Game Department's Response to GRP's Response to Fish and Game's Motion for Rehearing or Amendment - August 24, 2009
Letter from Executive Councilor Raymond S Burton - August 19, 2009
Service List - August 19, 2009
Applicant's Objection to Motions for Rehearing of Industrial Wind Action Group and Public Counsel - August 19, 2009
Applicant's Response to Motion of NH Fish and Game Department for Rehearing or Amendment - August 19, 2009
Service List - August 17, 2009
Fish and Game Department's Motion for Rehearing or Amendment - August 14, 2009
Motion of Counsel for the Public for Rehearing - August 14, 2009
Motion of IWAG for Rehearing or Amendment - August 14, 2009
Applicant's Contested Motion for Rehearing, Reconsideration and or Clarification - August 14, 2009
Decision Granting Certificate of Site and Facility With Conditions - July 15, 2009
Public Hearing - June 26, 2009
Affidavits of Publication - June 25, 2009
Day 4 - Deliberative Session - June 10, 2009
Notice of Public Hearing - June 1, 2009
Day 3, Part 2 - Deliberative Session - May 27, 2009
Day 3, Part 1 - Deliberative Session - May 27, 2009
Affidavits of Publication - May 27, 2009
Applicant's Response to Fish and Game Department's Response to the May 8, 2009 Order - May 21, 2009
Applicant's Responses to April 17, 2009 Subcommittee Data Requests - May 21, 2009
NH Fish and Game Department's Response to the May 8, 2009 Order - May 14, 2009
Order and Notice of Public Meeting - May 12, 2009
2008-04 Granite Reliable Order Proc Sched - May 8, 2009
Day 2A - Deliberative Session - April 29, 2009
Final 401 Water Quality Certification for Granite Reliable Power Windpark - April 28, 2009
Applicant's Objection to Motion of IWAG to Suspend SEC Deliberations and Reopen the Public Record - April 28, 2009
Motion of IWAG to Suspend SEC Deliberations and Reopen the Public Record - April 27, 2009
NH Fish and Game Response to Data Request - April 27, 2009
Applicant's Responses to 4-17-09 Subcommittee Data Requests - April 23, 2009
Day 2 - Deliberative Session - April 20, 2009
Day 1 - Deliberative Session - April 17, 2009
Letter from Executive Councilor Raymond S Burton - April 16, 2009
Motion of IWAG Seeking Withdrawal of NH Fish & Game Director Normandeau from the Subcommittee - April 16, 2009
Letter and Agreement from the Coos County Commissioners - April 14, 2009
Letter from Connie Hunt - April 13, 2009
Order and Notice of Public Meeting - April 10, 2009
Counsel for the Public's Post-Hearing Memorandum and Addendum of Conditions - April 10, 2009
Final Memorandum of Lisa Linowes on behalf of the Industrial Wind Action Group - April 10, 2009
Applicant's Post Hearing Brief - April 10, 2009
Post-Hearing Brief of Farrell S Seiler, Chairman, NH Wind Energy Association - April 9, 2009
Letter from Bob Ball - April 8, 2009
Post-Hearing Brief of Kathlyn J Keene, Intervenor - April 6, 2009
Section 106 Report from the NH Division of Historical Resources - April 6, 2009
Order Amending Briefing Schedule - April 6, 2009
NH Fish and Game Department's Post Hearing Brief - April 6, 2009
Letters from the Millsfield ATV Club - April 6, 2009
Appalachian Mountain Club Post Hearing Brief - April 6, 2009
IWAG Request for Extension of Time - April 5, 2009
Letter from Pauline H Craggy - April 4, 2009
Day 8 - Public Hearing - April 2, 2009
Letter from Barry C Nelson - April 1, 2009
Revised Petitioner Exhibit 45 a and Revised Petitioner 45 b - March 31, 2009
Order and Notice of Additional Public Hearing - March 31, 2009
Letter to Frederick W King from AG Ayotte - March 30, 2009
Letter from Theodore and Louise Caouette - March 30, 2009
Letter from Robert A Keene - March 30, 2009
Letter from Representatives Scott and Evalyn Merrick - March 30, 2009
Letter from Executive Councilor Raymond S Burton - March 30, 2009
Letter from Nate Lamoureux - March 27, 2009
Revised Petitioner Exhibit 43 - March 27, 2009
Kathlyn J Keene Intervenor Joinder - March 27, 2009
Objection of Counsel for the Public to Applicant's Motion to Strike - March 27, 2009
Letter from Jeffrey W Elliott - March 26, 2009
Letter from Kathlyn Keene to Atty. Doug Patch - March 26, 2009
Applicant's Contested Motion to Strike Post-Hearing Submissions Made by Intervenor Kathlyn Keene and Public Counsel - March 26, 2009
Letter from Lynn A Correnty - March 25, 2009
Motion of Counsel for the Public to Recall Christopher Lowe for Additional Cross Examination - March 25, 2009
Public Comment Hearing - March 23, 2009
Applicant's Request for Confidential Treatment - March 23, 2009
Applicant's Response to Oral Data Requests - March 23, 2009
Comments of the Counsel for the Public on The State Of The Birds, United States of America, 2009 - March 23, 2009
Letter from Bob Ball - March 22, 2009
LaFrance Settlement Agreement - March 22, 2009
Closing Statements - March 19, 2009
Day 7 - Public Hearing - March 19, 2009
Appalachian Mountain Club's Closing Statement - March 19, 2009
Affidavits of Publication - March 19, 2009
Day 6 - Public Hearing - March 17, 2009
Comments of the Appalachian Mountain Club on the draft 401 Water Quality Certification - March 17, 2009
Letter from John Harrigan - March 17, 2009
Letter from Ethyle M Sperry - March 17, 2009
IWAG letter to NHDES - March 15, 2009
Letter from Cindy Boucher - March 14, 2009
Day 4 - Public Hearing - March 13, 2009
Update to Testimony of Dr David Publicover on behalf of the Appalachian Mountain Club - March 13, 2009
Letter from the US Department of the Interior, Fish and Wildlife Service - March 12, 2009
Day 3 - Public Hearing - March 11, 2009
Letter from the US Environmental Protection Agency - March 11, 2009
Letter from Ray Hopkins - March 11, 2009
Day 2 - Public Hearing - March 10, 2009
Letter from the Nature Conservancy - March 10, 2009
Day 1 - Public Hearing - March 9, 2009
Applicant's Response to Objection of Counsel for the Public to Admission of Applicant's Exhibit 56 - March 8, 2009
Objection of Counsel for the Public to Admission of Applicant's Exhibit 56 - March 6, 2009
Letter from Brian Ruth - March 6, 2009
Order and Notice of Closing Arguments and Additional Public Hearing - March 6, 2009
Prehearing Conference - March 5, 2009
Fish and Game Department's Objection to the Applicant's Motion In Limine Regarding Evidence Concerning RSA 212-A - March 4, 2009
Fish and Game Department's Objection to the Applicant's Motion to Strike Prefiled Testimony of Will Staats and Jillian Kelly - March 4, 2009
Letter from Steven P Langella - March 3, 2009
Letter from Kathlyn J Keene - March 3, 2009
Letter from Wayne Urso - March 3, 2009
Letter from NH Audubon to USACE - February 27, 2009
Letter from NH Audubon - February 27, 2009
Letter from Jeffrey W Elliott - 2 - February 26, 2009
Letter from Jeffrey W Elliott - 1 - February 26, 2009
Letter from Jeanette Lee - February 25, 2009
Supplement to the Application - Volume 1-a - February 24, 2009
Supplement to the Application - Appendices Volume 6 - February 24, 2009
Supplemental Pre-filed Testimony of Dr David Publicover for the AMC - February 24, 2009
Supplemental Testimony of Dr Gary R Sanford for Counsel for the Public - February 24, 2009
Supplemental Testimony of Will Staats and Jillian Kelly for NHF&G - February 24, 2009
Testimony of James Sundstrom for Counsel for the Public - February 24, 2009
Supplemental Pre-filed Testimony of Kathlyn Keene, Intervenor - February 23, 2009
Affidavits of Publication - February 23, 2009
Kathlyn Keene, Intervenor's Objection to the Applicant's Contested Motion to Strike Pre-filed Testimony of Will Staats and Jillian Kelly on behalf of NHFG - February 22, 2009
Order on Emergency Motions Regarding Financial Consultant and Additional Discovery - February 20, 2009
Letter from Atty Evan J Mulholland - February 19, 2009
Letter from Counsel to Fish and Game - February 19, 2009
Reply Memorandum of Counsel for the Public to Objection of Granite Reliable Power, LLC - February 19, 2009
Applicant's Response to Emergency Motion and Order of Counsel to the Public - February 19, 2009
Notice of Withdrawal by Attorneys for Clean Power Development, LLC - January 17, 2009
Applicant's Request for Confidential Treatment - January 5, 2009
Direct Pre-Filed Testimony of Lisa Linowes on Behalf of IWAG - January 5, 2009
Testimony of Dr David Publicover on behalf of the Appalachian Mountain Club - January 5, 2009
Testimony of Kathlyn J Keene, Intervenor - January 5, 2009
Testimony on Behalf of Counsel for the Public of Dr. George M Mariani, Trevor Lloyd-Evans and Dr Gary R Sanford - January 5, 2009
Letter from BCL&I re deadline for state agency reports - January 5, 2009
Order Confirming Confidentiality Agreement Between Industrial Wind Action Group and Granite Reliable Power - December 30, 2008
AG Appearance on behalf of NHF&G - December 22, 2008
NH Fish and Game Pre-testimony of Will Staats and Jillian Kelly - December 19, 2008
Letter from Arthur & Rose Leclerc - December 13, 2008
Letter from Robert Leclerc of Milan Excavating Inc - December 11, 2008
Order Approving Payment of Consultant, Granting Confidentiality and Revising Procedural Schedule - December 8, 2008
Intervenor's Response to Applicant's Response to Kathlyn J Keene's Motion to Request Enlargement of Time to File Pre-filed Testimony - December 5, 2008
Applicant's Response to the 12-3-08 Motion of Kathlyn Keene - December 5, 2008
Applicant Request for Confidential Treatment - December 4, 2008
Kathlyn Keene Motion to Request Enlargement of Time to Submit Pre-filed Testimony - December 3, 2008
North Country Council Progress Report - November 14, 2008
NH Fish and Game Progress Report - November 13, 2008
NH Division of Historical Resources Letter to Julie Nark re End-Of-Field Letter Review - November 12, 2008
NH Natural Heritage Bureau Progress Report - November 12, 2008
DES Wetlands Bureau Status Report - November 12, 2008
DES Alteration of Terrain Status Report - November 12, 2008
DES Watershed Status Report - November 10, 2008
Motion of Counsel for the Public for Leave to Retain Consultants and Order Directing GRP to Bear the Costs - November 7, 2008
Order Granting Applicant's Motion for Protective Order and Approving Procedure for Treatment of Confidential, Commercial or Financial Information - November 4, 2008
Appointment of Fish and Game Designee - October 31, 2008
Letter from Brendan Prusik - October 30, 2008
Letter from Bruce Avery - October 30, 2008
NH Division of Historical Resources Progress Report - October 29, 2008
Letter from the Town of Dummer - October 23, 2008
Supplement to the Application - October 23, 2008
Letter from Chris Glenney - October 23, 2008
Applicant's Response to Motion of Counsel for the Public for Entry of an Order Directing Hearings be held in Coos County - October 23, 2008
Order Amending Deadline to Propound Data Requests - October 22, 2008
IWA Motion for Reconsideration of Deadline to Submit Data Request - October 21, 2008
Response of Clean Power Development to Applicant's Response to Intervention Requests - October 17, 2008
Applicant's Response to IWA's Motion and Kathlyn Keene's Motion - October 14, 2008
Order Granting Petitions to Intervene and Revising Procedural Schedule - October 14, 2008
Letter from the Town of Dummer - October 13, 2008
Motion of Counsel for the Public for Entry of an Order that Hearings be held in Coos County - October 13, 2008
Appointment of DOT Designee - October 13, 2008
Petition from the citizens of Millsfield - October 10, 2008
Public Hearing - October 2, 2008
Letter from Richard J Samson - October 2, 2008
Appointment of Fish and Game Designee - October 2, 2008
Letter from the Coos County Planning Board - September 30 , 2008
Keene Keene and Odell's Response to Applicant's Response to Intervention Requests - September 29, 2008
IWAG Response to Applicants Response to Intervention Requests - September 29, 2008
Publication of Display Ads - September 29, 2008
Report of Pre-Hearing Conference - September 26, 2008
Applicants Response to Intervention Requests - September 25, 2008
Post card from David Rose - September 25, 2008
Prehearing Conference - September 18, 2008
Request to Intervene - NH Wind Energy Association - September 18, 2008
Request to Intervene - Lisa Linowes - September 17, 2008
Request to Intervene - Wayne R Urso - September 17, 2008
Petition to Intervene - Appalachian Mountain Club - September 16, 2008
Appointment of DRED designee - September 15, 2008
Petition to Intervene - Clean Power Development LLC - September 15, 2008
Request from Jonathan Frizzell re service list - September 12, 2008
Request to Intervene - Robert A Keene - September 12, 2008
Request to Intervene - Sonja M Sheldon - September 12, 2008
Affidavits of Publication - September 11, 2008
Request to Intervene - Jon Odell - September 11, 2008
Letter from Coos County Commissioners - September 10, 2008
Request to Intervene - Kathlyn J Keene - September 10, 2008
Letter from GMO Renewable Resources - September 8, 2008
Appointment of OEP designee - August 29, 2008
Order and Notice of Public Information Hearing Site Inspection Visit and Pre-Hearing Conference - August 27, 2008
Appointment of Counsel for the Public - August 25, 2008
Order Accepting Application for Certification of Site and Facility and Designating a Subcommittee - August 14, 2008
Appointment of PUC staff engineer - August 13, 2008
NH Fish and Game comments on GRP application - August 6, 2008
Letter from KDRM LLC - July 31, 2008
Letter to Richard C Erwin - July 28, 2008
Letter to Patricia S Stinson - July 28, 2008
Letter to Michael King - July 28, 2008
Letter to Mariann Letarte - July 28, 2008
Letter to Louise Cote - July 28, 2008
Cover Letter of Application - July 15, 2008
NHSEC Application for Granite Reliable Power, LLC - July 15, 2008
- Appendix 1 - Financial Statements for Granite Reliable Power
- Appendix 2 - Standard Dredge and Fill Permit Application
- Appendix 3 - Site Specific Alteration Permit
- Appendix 3 - Site Specific Terrain Alteration Permit - Drain
- Appendix 4 - 401 Water Quality Certification
- Appendix 5a - Master Plan of Unincorporated Places in Coos County
- Appendix 5b - Millsfield and Erving’s Location Land Use Guidance Map
- Appendix 5c - Dixville and Dix Grant Land Use Guidance Map
- Appendix 5d - Odell Land Use Guidance Map
- Appendix 5e - Zoning Ordinances - Coos County Unincorporated
- Appendix 5f - Town of Dummer Master Plan
- Appendix 5g - Zoning Ordinance of Town of Dummer
- Appendix 6 - New Hampshire Division of Transportation Application for Driveway Permit
- Appendix 7 - V90.3.0 MW An Efficient Way to Move Power - Vestas
- Appendix 8 - System Impact Study
- Appendix 9 - Utility Wind Integration State of the Art
- Appendix 10 - New England Marginal Emissions Rate Analysis
- Appendix 11 - Granite Reliable Power Windpark Visual Impacts Report
- Appendix 12a - New Hampshire Division of Historical Resources Area Form
- Appendix 12b - Phase IA Report
- Appendix 13 - The US Electric Power Sector and Climate Change
- Appendix 14a - Introductory Speech IPCC
- Appendix 14b - IPCC Fourth Assessment Working Group Report
- Appendix 15 - Reconnaissance Level Rare Plant Survey at Proposed Windpark Coos County NH
- Appendix 16 - Natural Community Characterization, Granite Reliable Power Proposed Wind Power Project
- Appendix 17 - Rare Plant Survey Spring 2008
- Appendix 18 - Reconnaissance - Level Wetland & Vernal Pool Survey Proposed Windpark in Coos County
- Appendix 19 - Fall Radar Surveys of Nighttime Migration Activity at the Proposed Windpark
- Appendix 20 - Spring 2007 Radar, Visual and Acoustic Survey
- Appendix 21 - Fall 2007 Radar, Visual and Acoustic Survey
- Appendix 22 - Coordinated Survey Results for Proposed Granite Reliable Power
- Appendix 23 - Breeding Bird Study for Proposed Granite Reliable Power Windpark
- Appendix 24 - Breeding Bird Study for Proposed Granite Windpark - Dixville
- Appendix 25 - 2007 Winter Tracking Survey at Proposed Windpark in Coos County New Hampshire
- Appendix 26 - Risk Analysis of Ice Throw from Wind Turbines
- Appendix 27 - Advisory Circular - Obstruction Marking and Lighting
- Appendix 28 - Environmental Sounds Survey and Noise Impacts Assessments
- Appendix 29 - Facts about Wind Energy and Noise
- Appendix 30a - The Effect of Wind Development on Local Property Values
- Appendix 30b - Impacts of Windmill Visibility on Property Values in Madison County, NY
- Appendix 31 - Executive Summary - New Hampshire Energy Plan
- Appendix 32 - New Hampshire Clean Power Strategy
- Appendix 33a - Fact Sheet ARD-23 Global Climate Change and Its Impact on New Hampshire
- Appendix 33b - Information on Regional Greenhouse Gas Initiative (RGGI)
- Appendix 33c - Energy Programs - The Climate Change Challenge
- Appendix 33d - Overview of House Bill 284
- Appendix 33e - Energy Programs - NH Greenhouse Gas Registry
- Appendix 33f - About Us - New Hampshire Office of Energy Planning
- Appendix 34 - Application of Granite Reliable Power Proposed Exhibit List
- Appendix 35 - Documentation Indicating Copies of Application
- Appendices 36, 37 & 38 - Supplement to Application October 6, 2008
- Appendices 39 and 40 - Supplement to Application October 9, 2008
Pre-filed Testimony for Granite Reliable Power -
- Adam Gravel and Steve Pelletier Pre-filed Testimony
- Charles Reading and Pip Decker Pre-filed Testimony
- Christopher Lowe Pre-filed Testimony
- Dan Mandli Pre-filed Testimony
- David Hessler Pre-filed Testimony
- Hope Luhman Pre-filed Testimony
- Jean Vissering Pre-filed Testimony
- Matthew Borkowski Pre-filed Testimony
All documents have been saved in Portable Document Format (.pdf).
Visit nh.gov for a list of free .pdf readers for a variety of operating systems.
New Hampshire Site Evaluation Committee
21 South Fruit Street | Suite 10 |
Concord, NH 03301
(603) 271-2435 | TDD Access: Relay NH 1-800-735-2964 |
Hours: M-F, 8am-4:30pm